Skip to main content
Back To Top Top Back To Top
The Legislative Service Commission staff updates the Revised Code on an ongoing basis, as it completes its act review of enacted legislation. Updates may be slower during some times of the year, depending on the volume of enacted legislation.

Section 5709.212 | Fees for exempt facility certificate.

 
You are viewing a past version of this section that is no longer in effect View Current Version

(A) With every application for an exempt facility certificate filed pursuant to section 5709.21 of the Revised Code, the applicant shall pay a fee equal to one-half of one per cent of the total exempt facility project cost, not to exceed two thousand dollars. If the director of environmental protection is required to provide the opinion for an application, the fee shall be credited to the non-Title V clean air fund created in section 3704.035 of the Revised Code for use in administering section 5709.211 of the Revised Code, unless the application is for an industrial water pollution control facility. If the application is for an industrial water pollution control facility, the fee shall be credited to the surface water protection fund created in section 6111.038 of the Revised Code for use in administering section 5709.211 of the Revised Code. If the director of development is required to provide the opinion for an application, the fee for each exempt facility application shall be credited to the exempt facility inspection fund, which is hereby created in the state treasury, for appropriation to the development services agency for use in administering section 5709.211 of the Revised Code.

An applicant is not entitled to any tax exemption under section 5709.25 of the Revised Code until the fee required by this section is paid. The fee required by this section is not refundable, and is due with the application for an exempt facility certificate even if an exempt facility certificate ultimately is not issued or is withdrawn. Any application submitted without payment of the fee shall be deemed incomplete until the fee is paid.

(B) The application fee imposed under division (A) of this section for a jointly owned facility shall be equal to one-half of one per cent of the total exempt facility project cost, not to exceed two thousand dollars for each facility that is the subject of the application.

Available Versions of this Section