Section 511.12 | Plans, specifications and contracts.
The board of township trustees may prepare plans and specifications and make contracts for the construction and erection of a memorial building, monument, statue, or memorial, for the purposes specified and within the amount authorized by section 511.08 of the Revised Code. If the total estimated cost of the construction and erection exceeds the amount specified in section 9.17 of the Revised Code, the contract shall be let by competitive bidding. If the estimated cost is the amount specified in section 9.17 of the Revised Code or less, competitive bidding may be required at the board's discretion. In making contracts under this section, the board shall be governed as follows:
(A) Contracts for construction when competitive bidding is required shall be based upon detailed plans, specifications, forms of bids, and estimates of cost, adopted by the board.
(B) Contracts shall be made in writing upon concurrence of a majority of the members of the board, and shall be signed by at least two of the members and by the contractor. If competitive bidding is required, no contract shall be made or signed until an advertisement has been placed in a newspaper, published or of general circulation in the township, at least twice. The board may also cause notice to be inserted in trade papers or other publications designated by it or to be distributed by electronic means, including posting the notice on the board's internet web site. If the board posts the notice on its web site, it may eliminate the second notice otherwise required to be published in a newspaper published or of general circulation in the township, provided that the first notice published in such newspaper meets all of the following requirements:
(1) It is published at least two weeks before the opening of bids.
(2) It includes a statement that the notice is posted on the board's internet web site.
(3) It includes the internet address of the board's internet web site.
(4) It includes instructions describing how the notice may be accessed on the board's internet web site.
(C) No contract shall be let by competitive bidding except to the lowest and best bidder, who shall meet the requirements of section 153.54 of the Revised Code.
(D) When, in the opinion of the board, it becomes necessary in the prosecution of such work to make alterations or modifications in any contract, the alterations or modifications shall be made only by order of the board, and that order shall be of no effect until the price to be paid for the work or materials under the altered or modified contract has been agreed upon in writing and signed by the contractor and at least two members of the board.
(E) No contract or alteration or modification of it shall be valid unless made in the manner provided in this section.
(F) No project subject to this section shall be divided into component parts, separate projects, or separate items of work in order to avoid the requirements of this section.
Last updated September 12, 2023 at 9:49 AM
Available Versions of this Section
- September 29, 2011 – House Bill 153 - 129th General Assembly [ View September 29, 2011 Version ]
- October 3, 2023 – Amended by House Bill 33 - 135th General Assembly [ View October 3, 2023 Version ]