Section 4781.33 | Notice of flood event affecting manufactured home park.
You are viewing a past version of this section that is no longer in effect
View Current Version
Effective:
September 10, 2012
Legislation:
House Bill 487 - 129th General Assembly
When a flood event affects a manufactured home park, the operator of the manufactured home park, in accordance with rules adopted under section 4781.26 of the Revised Code, shall notify the manufactured homes commission and the board of health having jurisdiction where the flood event occurred within forty-eight hours after the end of the flood event. The commission, after receiving notification, shall immediately notify the board of health.
After being notified of such a flood event, the board of health shall cause an inspection to be made of the manufactured home park named in the notice. The board of health shall issue a report of the inspection to the commission within ten days after the inspection is completed.
Available Versions of this Section
- September 10, 2012 – House Bill 487 - 129th General Assembly [ View September 10, 2012 Version ]
- January 21, 2018 – Amended by House Bill 49 - 132nd General Assembly [ View January 21, 2018 Version ]