Skip to main content
Back To Top Top Back To Top
This website publishes administrative rules on their effective dates, as designated by the adopting state agencies, colleges, and universities.

Rule 4906-3-05 | Fully developed site or route information.

 

All standard certificate applications shall include fully developed information on the proposed sites or routes. A standard certificate application for an electric transmission line or gas pipeline should also identify a proposed alternative route together with a brief explanation of why the alternative route is less preferred than the proposed route. Information as to the alternative route need not be fully developed as part of the application filing.

Last updated May 30, 2024 at 9:11 AM

Supplemental Information

Authorized By: 4906.03, 4906.20
Amplifies: 4906.03, 4906.06, 4906.10, 4906.13, 4906.20
Five Year Review Date: 5/20/2029
Prior Effective Dates: 12/27/1976, 6/10/1989, 8/28/1998, 12/15/2003, 1/25/2009, 5/7/2009, 12/11/2015