Rule 1501:21-5-01 | Application procedures, general.

 

The procedure for applying for a construction permit and submitting the supporting engineering documents are to consist of two parts, the preliminary design report and the final design submittal, as described in rules 1501:21-5-02 to 1501:21-5-06 of the Administrative Code.